The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
More than 42% of Bulgarians are concerned about the development of artificial intelligence. According to a quick survey on the topic by the Myara agency, published by BTA, 37 percent of those surveyed said they were not familiar with..
Bulgarian Patriarch Daniil met yesterday with Prince Ghazi bin Muhammad - Chief Advisor to King Abdullah II for Religious and Cultural Affairs, the Bulgarian Patriarchate reported. The prince is part of the official delegation of..
The government will remain intolerant of any form of corruption. This was what Prime Minister Rosen Zhelyazkov said from the parliamentary rostrum regarding the investigation by the European Public Prosecutor's Office into the..
The President of Bulgaria, Rumen Radev, and the King of Jordan, Abdullah II, are hosting the Aqaba Process Summit, which focuses on the Balkans and brings..
Bulgarians have traditionally had a deep respect and gratitude for domestic animals. For generations, horses, oxen, donkeys and cows have been..
It is 21 years today since the tragedy in the River Lim on the border between Serbia and Montenegro, in which 12 Bulgarian children were killed. On..
+359 2 9336 661