The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The President of Bulgaria, Rumen Radev, and the King of Jordan, Abdullah II, are hosting the Aqaba Process Summit, which focuses on the Balkans and brings together nearly 30 delegations. These delegations are led by Heads of State, government..
Bulgaria cannot intervene in the espionage case against Bulgarian citizens in the UK. This was stated by Prime Minister Rosen Zhelyazkov during parliamentary question time, in response to a question from the Velichie party. "Criminal justice is carried..
Bulgarians have traditionally had a deep respect and gratitude for domestic animals. For generations, horses, oxen, donkeys and cows have been indispensable partners in agricultural life, faithfully assisting people in their daily work. While..
The President of Bulgaria, Rumen Radev, and the King of Jordan, Abdullah II, are hosting the Aqaba Process Summit, which focuses on the Balkans and brings..
Bulgarians have traditionally had a deep respect and gratitude for domestic animals. For generations, horses, oxen, donkeys and cows have been..
It is 21 years today since the tragedy in the River Lim on the border between Serbia and Montenegro, in which 12 Bulgarian children were killed. On..
+359 2 9336 661