The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
At the moment, there is no direct threat to our country stemming from the sharp deterioration of the security environment in the Middle East, President Rumen Radev announced after the three-hour meeting of the Consultative Council on..
We must be prepared for the worst-case scenario because the situation is escalating after Iran’s direct attack against Israel, said caretaker Minister of Defence Atanas Zapryanov for public service TV BNT. “We have response steps which is the next..
10,335 tons of roses have been produced in Bulgaria in 2024, almost 1,000 tons more than last year, the Consultative Council on Oil Bearing Roses says. There are almost 3,000 rose producers registered in the country, and 53 rose oil distilleries..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La..
Due to the official recommendation of the European Commission and the European Union Aviation Safety Agency (EASA), Bulgaria Air has canceled all..
On Friday, lows will be between 10 and 15 degrees Celsius , 13°C in Sofia. Maximum temperatures will be between 26 and 31°C, 28° in the capital. During..
+359 2 9336 661