The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links poll, commissioned by bTV shows. GERB/SDS would earn 23.1% of the votes, followed by We..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution as member of parliament and as candidate for member of parliament in the upcoming election...
What is the noise level of an airplane engine or a hand drill, a normal conversation, the movement of a car at a speed of 60 km/h, in a disco, at a rock concert and which values are dangerous for people's health and the animals? The answers to..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La..
Due to the official recommendation of the European Commission and the European Union Aviation Safety Agency (EASA), Bulgaria Air has canceled all..
On Friday, lows will be between 10 and 15 degrees Celsius , 13°C in Sofia. Maximum temperatures will be between 26 and 31°C, 28° in the capital. During..
+359 2 9336 661