The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The deadline for submitting advance applications to vote abroad for the upcoming early parliamentary elections on October 27 has expired. It is expected that about 720 polling stations will be opened outside Bulgaria , and the exact number will be..
We firmly condemn Iran's continued missile strikes against Israel, we support the regional stability and security of the State of Israel, says a position of the Bulgarian Ministry of Foreign Affairs uploaded on the X network. Due to the tension..
With two flights of the government Airbus in two days, the Bulgarian state managed to evacuate 169 Bulgarians and their families from Lebanon after the escalation of tensions there. "Thank God we're back, " says one of the Bulgarians with..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La..
Due to the official recommendation of the European Commission and the European Union Aviation Safety Agency (EASA), Bulgaria Air has canceled all..
On Friday, lows will be between 10 and 15 degrees Celsius , 13°C in Sofia. Maximum temperatures will be between 26 and 31°C, 28° in the capital. During..
+359 2 9336 661