The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The increase in toll taxes seriously affects international carriers and all those involved in this activity in the country. Despite the meeting between representatives of carriers and the Minister of Regional Development and Public Works, Ivan Ivanov,..
Bulgarian President Rumen Radev and Jordan's King Abdullah II will be hosting a high-level meeting under the Aqaba Process initiative, focusing on security challenges in the Balkans. King Abdullah II of Jordan visits Sofia to co-chair high-level..
The second edition of the festival of antiquity "Diocletianopolis - Crossroads of Time" will be held from April 4 to 6, 2025 in the city of Hisarya. The modern city of Hisarya arose on the ruins of the ancient Roman city of..
It is 21 years today since the tragedy in the River Lim on the border between Serbia and Montenegro, in which 12 Bulgarian children were killed. On..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her..
+359 2 9336 661