The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
On Monday there will be snow showers or a mix of rain and snow in many places. The precipitation will decrease and stop, and the clouds will clear in the evening. The minimum temperature will be minus 3°C, around minus 1°C in Sofia, and the maximum will..
After a fire destroyed the roof of the historic National High School of Applied Arts in Tryavna on Friday morning, students are taking a week-long emergency break. With the help of the fire brigade, civil protection teams and local businesses, the..
The large-scale inspection, carried out by the competent police structures of the National Police Directorate and the regional directorates of the Interior Ministry, will continue next week to get the full picture - where, what and how many are the..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her..
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the..
+359 2 9336 661