The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest temperature will be 19-20°C, while in the eastern regions of the country the temperature will reach up to..
The Court of Justice of the EU has overturned part of European legislation requiring trucks for international transport to return every two months to the carrier's base. With its decision, the institution confirmed all other..
There is a potential danger of a wave of migrants, caretaker Prime Minister Dimitar Glavchev said at a briefing after the meeting of the Consultative Council on National Security , at which the risks to this country stemming from the..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution..
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links..
+359 2 9336 661