The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The 17 th classic car and motorcycle parade is to take place in Burgas’ Primorski Park from 10 AM until 2.30PM today. More than 150 collectors from Burgas and the country will take part, Dimo Dzhambazov, chair of the Retro motor club, organizer of..
On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..
The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..
The Balkans are attracting more and more medical tourists, with Turkiye being the undisputed leader, ranking among the top 10 most preferred countries..
Hungary’s Deputy Interior Minister Bence Retvari stated that the abolition of Bulgaria and Romania’s Schengen borders by land is very important to the..
The Movement for Rights and Freedoms (DPS) will immediately return the second government- forming mandate , DPS Co-chairman Delyan Peevski told..
+359 2 9336 661