“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
At a national meeting convened by acting Prosecutor-General Borislav Sarafo v to discuss the rise in public and domestic violence, it was declared that the Prosecutor's Office and the Ministry of the Interior would not tolerate such crimes. "Under my..
The clashes outside the Ivan Vazov National Theatre during the opening night of John Malkovich's production of Bernard Shaw's Arms and the Man have prompted 247 theatre organisations from 39 countries to appeal to the institutions of the European Union...
President Rumen Radev announced in Dobrich the launch of the 22nd edition of the "Bulgarian Christmas" charity campaign. The theme of the campaign is "Giving Hope to a Child in Need". The aim is to raise money for high-tech equipment for early..
The coalition BSP-United Left, which placed fifth in the parliamentary elections held on October 27, is starting a series of negotiations to gather..
By order of the Minister of Education and Science, Prof. Galin Tsokov, January 3, 2025, has been declared a non-school day for all schools in Bulgaria...
10 people from a criminal organization for migrant trafficking have been detained in a police operation in the Burgas region . Among those detained is..
+359 2 9336 661