“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Food Safety Agency (BFSA) has now sent samples from herds found to have peste des petits ruminants (PPR) to the reference laboratory in Montpellier, France, for confirmation as a measure to increase public confidence in the work of the institutions...
Bulgarian President Rumen Radev gave a lecture on the prospects and challenges for young people at the University of National and World Economy in Sofia. At the end of his speech, he answered questions from students. Asked about the wars in..
The European Commission is insisting on the urgent implementation of strict measures to eradicate the outbreak of sheep plague in Velingrad. In a statement, the Directorate-General for Crisis Preparedness in Food, Animals and Plants of the..
The coalition BSP-United Left, which placed fifth in the parliamentary elections held on October 27, is starting a series of negotiations to gather..
By order of the Minister of Education and Science, Prof. Galin Tsokov, January 3, 2025, has been declared a non-school day for all schools in Bulgaria...
10 people from a criminal organization for migrant trafficking have been detained in a police operation in the Burgas region . Among those detained is..
+359 2 9336 661