“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
On Tuesday, lows will be between 1 and 6°C, 1°C in Sofia. During the day it will remain mostly cloudy, with showers mainly in the southeast. Over southwestern Bulgaria the clouds will break up and clear. Maximum temperatures will be 4° to 9°C, around..
The Bulgarian Academy of Sciences is to have a female president for the first time. Corresponding Member Evelina Slavcheva from the Institute of Electrochemistry and Energy Systems was elected today to lead the 155-year-old institution...
At a national meeting convened by acting Prosecutor-General Borislav Sarafo v to discuss the rise in public and domestic violence, it was declared that the Prosecutor's Office and the Ministry of the Interior would not tolerate such crimes. "Under my..
"We demand the resignation of the management of the Bulgarian Food Safety Agency for failing to address the problems, specifically the case with the..
North Macedonia’s Foreign Minister Timčo Mucunski was heard in the European Parliament’s Foreign Affairs Committee. He..
A concert entitled “Volunteer’s Day” will bring together young talents dedicated to the causes of healthy living and volunteering on one stage in..
+359 2 9336 661