“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
An international event focusing on European policies for a sustainable planet and climate change is being held today at Sofia University "St. Kliment Ohridski". The event is organised by the National Centre for Polar Studies at Sofia University and the..
On Tuesday, lows will be between 1 and 6°C, 1°C in Sofia. During the day it will remain mostly cloudy, with showers mainly in the southeast. Over southwestern Bulgaria the clouds will break up and clear. Maximum temperatures will be 4° to 9°C, around..
The Bulgarian Academy of Sciences is to have a female president for the first time. Corresponding Member Evelina Slavcheva from the Institute of Electrochemistry and Energy Systems was elected today to lead the 155-year-old institution...
The coalition BSP-United Left, which placed fifth in the parliamentary elections held on October 27, is starting a series of negotiations to gather..
By order of the Minister of Education and Science, Prof. Galin Tsokov, January 3, 2025, has been declared a non-school day for all schools in Bulgaria...
10 people from a criminal organization for migrant trafficking have been detained in a police operation in the Burgas region . Among those detained is..
+359 2 9336 661