“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The group of Bulgarians accused in the UK of spying for Russia acted against Bulgarian journalist Hristo Grozev, who works for Bellingcat. This was stated by prosecutor Alison Morgan in the court in London. The group tried to use..
North Macedonia’s Foreign Minister Timčo Mucunski was heard in the European Parliament’s Foreign Affairs Committee. He said that some of his fondest memories are from Bulgaria, but accused Sofia of stalling Skopje’s..
A concert entitled “Volunteer’s Day” will bring together young talents dedicated to the causes of healthy living and volunteering on one stage in Sofia today. One of the goals of the event is to support the personal growth of young people and..
The coalition BSP-United Left, which placed fifth in the parliamentary elections held on October 27, is starting a series of negotiations to gather..
By order of the Minister of Education and Science, Prof. Galin Tsokov, January 3, 2025, has been declared a non-school day for all schools in Bulgaria...
10 people from a criminal organization for migrant trafficking have been detained in a police operation in the Burgas region . Among those detained is..
+359 2 9336 661