“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Around 45% of the country's eligible young people voted in the European Parliament elections on 9 June . The data comes from the Youth Participation in Democratic Life project, in partnership with the Centre for Human Resources Development and the..
The National Revenue Agency and the Customs Agency have launched a joint campaign to prevent and combat gambling and drug addiction, the NRA has announced. The efforts of the two tax authorities to target young people in the joint initiative are..
Bulgarian President Rumen Radev will hold a meeting with members of the parliamentary group "We Continue the Change - Democratic Bulgaria" (PP-DB), the press service of the president announced. The conversation will be at Dondukov 2 at 4:00 p.m., on July..
Seven fires are burning in forest areas in the districts of Plovdiv, Haskovo, Kyustendil and Yambol, the Executive Forests Agency said. In..
Caretaker Premier Dimitar Glavchev and the Director of the General Directorate Fire Safety and Civil Protection, Chief Commissioner Alexander Dzhartov,..
Bulgarian politicians and institutions have condemned the assassination attempt on Donald Trump. "We are deeply shocked by the horrific attack on..
+359 2 9336 661