“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
On Wednesday, the lowest temperatures will range from 0°C to 5°C, for Sofia 0°C. During the day, it will be mostly cloudy with fog in the plains. There will be light rain in some places. Daytime highs will be between 4°C and 9°C, around 6°C in the..
Caretaker Minister of Foreign Affairs Ivan Kondov held a bilateral meeting with his Ukrainian counterpart Andrii Sybiha during the NATO Foreign Ministers' Meeting. Ivan Kondov assured that Bulgaria will continue its unwavering and consistent support..
Caretaker Minister of Transport and Communications Krasimira Stoyanova met in Sofia with the Ambassador of Ukraine to Bulgaria, Olesya Ilashchuk. The two discussed ensuring the smooth movement of Ukrainian cargo to the EU via the Solidarity..
"We demand the resignation of the management of the Bulgarian Food Safety Agency for failing to address the problems, specifically the case with the..
North Macedonia’s Foreign Minister Timčo Mucunski was heard in the European Parliament’s Foreign Affairs Committee. He..
A concert entitled “Volunteer’s Day” will bring together young talents dedicated to the causes of healthy living and volunteering on one stage in..
+359 2 9336 661