550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
The Bulgarian Ministry of Defense has signed a contract with Polish state company Wojskowe Zakłady Lotnicze Nr 2 S.A. for major repair of six MiG-29 aircraft engines. The maximum period for carrying out the repair of each engine will be no more..
The chief of police in Petrich and two other police officers, arrested two days ago, are accused of participating in a criminal group. This was announced by Sofia city prosecutor Iliana Kirilova, BTA reported. According to Kirilova, the detained..
The Sofia City Prosecutor's Office has announced the release of Dzheyhan Ibryamov. He will be released from custody tomorrow, November 7, and the investigation against him on charges of influence peddling will be suspended at the moment he takes the..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
A protest organized by nationalist organizations in front of the Ivan Vazov National Theatre last night against the premiere of Bernard Shaw’s play..
There Is such a People (ITN) has collected 67 signatures and are submitting a complaint to the Constitutional Court for the partial annulment of the..
+359 2 9336 661