550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
The ambassadors of the EU Member States have reached a preliminary agreement on the draft decision to abolish checks at internal land borders for Bulgaria and Romania. This is planned to happen on January 1, 2025. The decision is expected to be finally..
Shopping malls in Sofia and across the country will increase the number of security guards where needed. Additional panic buttons are also to be put in place if retailers wish, the Bulgarian Retail Association said. Groups of suspicious persons will be..
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%, which marks a significant decrease compared to last year, when it was 11.61%. This is the lowest..
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%,..
At the opening of a business forum in Ho Chi Minh City during his official visit to Vietnam, Bulgarian President Rumen Radev pointed out that Bulgaria..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661