550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
There is a potential danger of a wave of migrants, caretaker Prime Minister Dimitar Glavchev said at a briefing after the meeting of the Consultative Council on National Security , at which the risks to this country stemming from the..
At the moment, there is no direct threat to our country stemming from the sharp deterioration of the security environment in the Middle East, President Rumen Radev announced after the three-hour meeting of the Consultative Council on..
We must be prepared for the worst-case scenario because the situation is escalating after Iran’s direct attack against Israel, said caretaker Minister of Defence Atanas Zapryanov for public service TV BNT. “We have response steps which is the next..
In December this year the Ministry of Finance will have covered the last of the criteria for accession to the Eurozone – inflation, said caretaker..
30 buildings across the country will be illuminated in green tonight to mark European Donation Day – the European Day for Organ, Tissue and Cell..
On Sunday the weather will be predominantly cloudy, with the clouds scattering temporarily over Western Bulgaria. There will be rain in many parts with..
+359 2 9336 661