550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
Daily Mail Online published a letter from former teacher Simon Hill under the title “I’m living the Bulgarian retirement dream”. The retiree and his wife own two properties in Bulgaria. They get better healthcare, enjoy hot summers and ski in the..
Bulgaria and the United States are to expand the scope of their Intergovernmental Agreement for cooperation on the project for the construction of a new unit at the Kozloduy Nuclear Power Plant and the civil nuclear programme. This possibility was..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La Francophonie, which will be held on October 3 in Paris, the Foreign Ministry announced. The foreign ministers..
In December this year the Ministry of Finance will have covered the last of the criteria for accession to the Eurozone – inflation, said caretaker..
30 buildings across the country will be illuminated in green tonight to mark European Donation Day – the European Day for Organ, Tissue and Cell..
On Sunday the weather will be predominantly cloudy, with the clouds scattering temporarily over Western Bulgaria. There will be rain in many parts with..
+359 2 9336 661