550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
The Bulgarian MPs gathered in plenary today for a sixth attempt to elect a President, which again proved unsuccessful. The chances of electing a Speaker of the 51st National Assembly are minimal The candidates Natalia Kiselova from..
Bulgaria's Ambassador to Egypt Deyan Katrachev met with Egypt's newly appointed Minister of Civil Aviation Sameh al-Hefny . At the meeting, which took place on 26 November, both discussed the updating of the air transport agreements between the two..
Representatives of the Food Safety Agency have arrived in Velingrad to take new samples from the 1,700 sheep quarantined because of a suspected plague outbreak. BNR correspondent in Pazardzhik Nevena Petrova reported that the Food Agency..
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%,..
At the opening of a business forum in Ho Chi Minh City during his official visit to Vietnam, Bulgarian President Rumen Radev pointed out that Bulgaria..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661