“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The team of Second English Language School "Thomas Jefferson" in Sofia won the sixth edition of a European law contest for students, which was held in Romania, the Ministry of Education has reported. At the contest, students simulate a trial on cases..
The group of Bulgarians accused in the UK of spying for Russia acted against Bulgarian journalist Hristo Grozev, who works for Bellingcat. This was stated by prosecutor Alison Morgan in the court in London. The group tried to use..
North Macedonia’s Foreign Minister Timčo Mucunski was heard in the European Parliament’s Foreign Affairs Committee. He said that some of his fondest memories are from Bulgaria, but accused Sofia of stalling Skopje’s..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
On Monday, the weather will continue cloudy in most parts of the country with rain, more significant in the southeastern regions. Light snow will fall..
"We demand the resignation of the management of the Bulgarian Food Safety Agency for failing to address the problems, specifically the case with the..
+359 2 9336 661