Bulgarian Prime Minister Boyko Borissov held a meeting with his Russian counterpart Dmitry Medvedev during the Caspian Economic Forum in Turkmenistan.
Dmitry Medvedev laid emphasis on the need to integrate the Caspian with the Black Sea region. Bulgaria is on the opposite end of the Black Sea and is a gateway to the European continent, Boyko Borissov answered. We usually discuss natural gas but you should bear in mind that trade relations, rail, automobile and maritime transport and the centres in Bulgaria and Russia to the North of the Caspian Sea have a huge potential, Boyko Borissov said. The Black Sea should continue to be a sea of peace, trade, tourism, transport connections and gas pipelines, the Bulgarian Prime Minister urged.
Among the topics discussed at the meeting between Borissov and Medvedev was the possibility of realization of the Belene NPP project under the conditions set by the Bulgarian side.
The Sofia Christmas Festival will open tonight in the park in front of the National Palace of Culture in the heart of Sofia . The third edition of the festival starts at 6.30 pm with a rich program and attractions - а Ferris wheel, a carousel and..
Yet another, already fifth attempt by MPs to elect a Parliamentary Speaker has failed. Four candidates were put to the vote - Natalia Kiselova from BSP-Unified Left, Petar Petrov from Vazrazhdane, Raya Nazaryan from GERB and Silvi Kirilov from ITN...
The traffic of trucks in the area of the Danube Bridge at the border with Romania is heavy. This situation is expected to continue over the weekend as the trucks that were waiting at the Kapitan Andreevo crossing at the Bulgarian-Turkish border for..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661