Bulgarian Prime Minister Boyko Borissov held a meeting with his Russian counterpart Dmitry Medvedev during the Caspian Economic Forum in Turkmenistan.
Dmitry Medvedev laid emphasis on the need to integrate the Caspian with the Black Sea region. Bulgaria is on the opposite end of the Black Sea and is a gateway to the European continent, Boyko Borissov answered. We usually discuss natural gas but you should bear in mind that trade relations, rail, automobile and maritime transport and the centres in Bulgaria and Russia to the North of the Caspian Sea have a huge potential, Boyko Borissov said. The Black Sea should continue to be a sea of peace, trade, tourism, transport connections and gas pipelines, the Bulgarian Prime Minister urged.
Among the topics discussed at the meeting between Borissov and Medvedev was the possibility of realization of the Belene NPP project under the conditions set by the Bulgarian side.
New car sales in Bulgaria in October increased three times more than the average for the European Union , where the purchase of new cars is only 1.1%. According to the Association of European Automobile Manufacturers, 75.9% of cars registered in..
77 per cent of those employed in Bulgaria's secondary education system are ready to go out on strike demanding a pay rise in the sector, according to a national survey by Podkrepa trade union. Half of those surveyed are in favour of a nation-wide..
The damage control and fire-fighting teams in Shumen have responded to 10 reports of damage due to the strong wind, the Regional Directorate of the Interior Ministry has announced. More often than not the reports were of fallen trees and branches in..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661