Bulgarian Prime Minister Boyko Borissov held a meeting with his Russian counterpart Dmitry Medvedev during the Caspian Economic Forum in Turkmenistan.
Dmitry Medvedev laid emphasis on the need to integrate the Caspian with the Black Sea region. Bulgaria is on the opposite end of the Black Sea and is a gateway to the European continent, Boyko Borissov answered. We usually discuss natural gas but you should bear in mind that trade relations, rail, automobile and maritime transport and the centres in Bulgaria and Russia to the North of the Caspian Sea have a huge potential, Boyko Borissov said. The Black Sea should continue to be a sea of peace, trade, tourism, transport connections and gas pipelines, the Bulgarian Prime Minister urged.
Among the topics discussed at the meeting between Borissov and Medvedev was the possibility of realization of the Belene NPP project under the conditions set by the Bulgarian side.
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would lift its veto and that Bulgaria and Romania would probably become full members of Schengen from the..
President Rumen Radev met with Bulgarians living and working in Singapore during his visit to the Asian country on November 22-24. There are an estimated 400 Bulgarians living in Singapore. "Our diaspora in Singapore occupies a very special..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661