Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Bulgaria’s Minister of Defence Atanas Zapryanov described as fake news the reports about terrorist threats against Bosnia and Herzegovina (BiH) from Bulgarian territory. ''Bulgaria contributes to the peace and security of Bosnia and Herzegovina by..
Due to the official recommendation of the European Commission and the European Union Aviation Safety Agency (EASA), Bulgaria Air has canceled all flights to and from Israel until October 15, the national carrier announced on its website. The measure..
There has been no change in the security environment since Bulgaria's accession to the Schengen area on March 31, caretaker Minister of Interior Atanas Ilkov said during a working meeting with the ambassadors of the EU member states, organized by..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution..
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links..
What is the noise level of an airplane engine or a hand drill, a normal conversation, the movement of a car at a speed of 60 km/h, in a disco, at a..
+359 2 9336 661