Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Another evacuation flight from Lebanon to Bulgaria would be risky and almost impossible to organise , said Bulgaria's ambassador in Beirut, Iassen Tomov. Alternative options are being considered to bring the Bulgarian citizens home. On Tuesday, 169..
Most Bulgarians (60%) are optimistic about the future of the EU. The EU-wide figure is 65%, according to a Eurobarometer post-election survey published by the European Parliament. Positive attitudes towards the Community are also high - more..
Daily Mail Online published a letter from former teacher Simon Hill under the title “I’m living the Bulgarian retirement dream”. The retiree and his wife own two properties in Bulgaria. They get better healthcare, enjoy hot summers and ski in the..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution..
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links..
What is the noise level of an airplane engine or a hand drill, a normal conversation, the movement of a car at a speed of 60 km/h, in a disco, at a..
+359 2 9336 661