Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Bulgaria and the United States are to expand the scope of their Intergovernmental Agreement for cooperation on the project for the construction of a new unit at the Kozloduy Nuclear Power Plant and the civil nuclear programme. This possibility was..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La Francophonie, which will be held on October 3 in Paris, the Foreign Ministry announced. The foreign ministers..
Bulgaria’s Ministry of Foreign Affairs calls on Bulgarian citizens in Iran to leave the country immediately due to the escalation of tensions in the Middle East, the Situation Center announced on the Foreign Ministry’s website. Bulgarian citizens in..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution..
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links..
What is the noise level of an airplane engine or a hand drill, a normal conversation, the movement of a car at a speed of 60 km/h, in a disco, at a..
+359 2 9336 661