Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
On Sunday the weather will be predominantly cloudy, with the clouds scattering temporarily over Western Bulgaria. There will be rain in many parts with thunder in the Rhodopes and the Eastern regions where there will be more significant rainfall...
30 buildings across the country will be illuminated in green tonight to mark European Donation Day – the European Day for Organ, Tissue and Cell Donation, the Executive Agency Medical Supervision has announced. The idea is to show solidarity for the..
“One of the leading factors of motivation and morale of the people fighting at the front is the availability of fast and reliable medical evacuation, as well as of effective and adequate medical assistance and its provision in the immediate vicinity..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution..
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links..
What is the noise level of an airplane engine or a hand drill, a normal conversation, the movement of a car at a speed of 60 km/h, in a disco, at a..
+359 2 9336 661