Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
New parking lots with over 1,000 parking spaces, including special areas for people with limited mobility and electric vehicle charging stations, were opened at Sofia Airport today. The parking lots are divided into short-term and..
A Bulgarian businessman has been charged by the European Public Prosecutor's Office with attempted fraud with Chinese agricultural machinery. He tried to present the machinery as Bulgarian-made. A lawsuit has been filed in the Sofia..
Boyko Boris s ov, leader of the GERB-SDS coalition that won the parliamentary elections on October 27, announced he is withdrawing his candidacy for prime minister. At a briefing at the party headquarters he urged the PP-DB to..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
After the meeting with his Vietnamese counterpart Luong Cuong in Hanoi, President Rumen Radev emphasized that Bulgaria will continue to support efforts..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
+359 2 9336 661