Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
If a referendum was held on whether to continue the country's membership in NATO, 59% of Bulgarians would answer affirmatively, according to a study by the Alliance. According to this indicator, Bulgaria ranks penultimate among..
The 17 th classic car and motorcycle parade is to take place in Burgas’ Primorski Park from 10 AM until 2.30PM today. More than 150 collectors from Burgas and the country will take part, Dimo Dzhambazov, chair of the Retro motor club, organizer of..
On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..
Hungary’s Deputy Interior Minister Bence Retvari stated that the abolition of Bulgaria and Romania’s Schengen borders by land is very important to the..
ContourGlobal Maritsa East 3 TPP has announced that another 160 people from the coal-fired power plant will be laid off in the coming months after the..
The position Bulgaria is going to the NATO summit with indicates that Bulgaria could offer Ukraine EUR 80 million , caretaker PM Dimitar Glavchev told..
+359 2 9336 661