Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
The Bulgarian Society for the Protection of Birds announced the first successful hatching of Egyptian vultures in the wild in our country. The bird is considered the most endangered species on the Balkan Peninsula. The female..
From his Facebook profile, the co-chairman of "We Continue the Change" Kiril Petkov announced that the PP-DB coalition will not negotiate with "Vazrazhdane" to form a cabinet. He defined as "media suggestions" the claims that such..
The Ukrainian Embassy in Bulgaria has called on officials and political forces to refrain from using the topic of the war for political purposes. The diplomatic mission emphasizes that Ukrainians pay the most terrible price every day..
Hungary’s Deputy Interior Minister Bence Retvari stated that the abolition of Bulgaria and Romania’s Schengen borders by land is very important to the..
ContourGlobal Maritsa East 3 TPP has announced that another 160 people from the coal-fired power plant will be laid off in the coming months after the..
The position Bulgaria is going to the NATO summit with indicates that Bulgaria could offer Ukraine EUR 80 million , caretaker PM Dimitar Glavchev told..
+359 2 9336 661