In the next 10 years, more than 19,000 megawatts of new capacities will be built in Bulgaria, as 90% of them will use renewable energy sources such as the sun, wind and water, according to the ten-year plan for the development of the transmission electricity network of the Electricity System Operator. 85 percent of the new RES capacities will be photovoltaic plants.
The plan does not include new nuclear power capacities due to the complexity and long process of construction.
According to the Electricity System Operator, in the coming years the country, which is now a major exporter, will cover its consumption by importing electricity at a more competitive price.
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
As of 1 December until the end of February, driving an old car in the centre of Sofia will be subject to a EUR 25-100 fine. The fines for legal entities will be 10 times higher – from EUR 500 to EUR 1,000. The low emission zone was put in place..
The Democrats for a Strong Bulgaria (DSB) are to nominate the party’s leader Atanas Atanasov for president of the 51 st National Assembly...
The second edition of the Festival of Apiculture Products continues in Pleven. The exposition features honey and apiculture products, as well as honey..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
+359 2 9336 661