In the next 10 years, more than 19,000 megawatts of new capacities will be built in Bulgaria, as 90% of them will use renewable energy sources such as the sun, wind and water, according to the ten-year plan for the development of the transmission electricity network of the Electricity System Operator. 85 percent of the new RES capacities will be photovoltaic plants.
The plan does not include new nuclear power capacities due to the complexity and long process of construction.
According to the Electricity System Operator, in the coming years the country, which is now a major exporter, will cover its consumption by importing electricity at a more competitive price.
Today's eighth attempt by the Bulgarian MPs to elect a speaker of the National Assembly also proved unsuccessful. At the beginning of the day, there was a ray of hope that this time the people's representatives would reach a..
Public attitudes towards HIV/AIDS in Bulgaria show that a quarter of Bulgarians are ready to keep friendships with HIV-positive people, BTA reported. Men are slightly more tolerant than women (28% versus 23%). The data are from a..
GERB/SDS has withdrawn its nomination for president of the National Assembly. In the upcoming 8 th attempt to elect a president of parliament, there will be 3 candidates. Vazrazhdane is once again nominating Petar Petrov. There Is Such a People (ITN)..
The Democrats for a Strong Bulgaria (DSB) are to nominate the party’s leader Atanas Atanasov for president of the 51 st National Assembly...
The second edition of the Festival of Apiculture Products continues in Pleven. The exposition features honey and apiculture products, as well as honey..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
+359 2 9336 661