In the next 10 years, more than 19,000 megawatts of new capacities will be built in Bulgaria, as 90% of them will use renewable energy sources such as the sun, wind and water, according to the ten-year plan for the development of the transmission electricity network of the Electricity System Operator. 85 percent of the new RES capacities will be photovoltaic plants.
The plan does not include new nuclear power capacities due to the complexity and long process of construction.
According to the Electricity System Operator, in the coming years the country, which is now a major exporter, will cover its consumption by importing electricity at a more competitive price.
The PP-DB coalition will send a letter to the GERB party calling for support for the adoption of 3 anti-corruption laws in the outgoing parliament, PP co-chairman Kiril Petkov announced. The formation places support for these laws as..
Human error, a technical malfunction or an incorrect command are the versions on which investigators of the reasons that led to the crash of the L-39 training aircraft in "Graf Ignatievo" work. This is what Major Hristo Anchev, a..
At an informal meeting, Bulgarian President Rumen Radev accepted the invitation of his North Macedonian counterpart, Gordana Siljanovska-Davkova, for an official visit to Skopje. A date for the visit has not been set. There was no official..
Bulgaria's President Rumen Radev described his meeting with the President of the Republic of North Macedonia Gordana Siljanovska-Davkova, which took..
The 2024-2025 school year will be the first in decades in which text books will be free for all pupils. 509 text books and general subjects study sets..
At a meeting today, the National Council for Tripartite Cooperation will discuss a draft decree of the Council of Ministers setting the country's poverty..
+359 2 9336 661