The rehabilitated 5th unit of the Belmeken Pumped Storage Hydro Power Plant (Belmeken PSHPP) has officially been opened by Prime Minister Nikolai Denkov and Energy Minister Rumen Radev, public service TV BNT reports.
The project is worth EUR 10 million, 70% of which from the Kozloduy fund, and manager of the programme is the European Bank, Minister Radev said. The first two units were made operational in 2022, another 2 - in 2023, and the last unit is being made operational now. In the past few years the role of these facilities has surpassed the expectations of the people who built them, and pumped storage hydro power plants are now part of the flexibility of our energy system, PM Denkov stated further.
Hacker group Ransomhouse announced on its website that it has data leaked from the information systems of the Supreme Administrative Court. As evidence, documents with lists of names and personal data of employees, as well as various documents have..
The situation in the country illustrates the urgent need for the state to create conditions for holding more farmers' markets, where farmers can sell their produce directly to consumers. This was stated by the Bulgarian Farmers' Union in connection..
A specialized police operation by the Directorate of the Bulgarian Anti-Drug and Drug Enforcement Administration (GDBOP) uncovered an organized crime group operating in the Blagoevgrad region , related to the distribution of narcotics. 5 kg of..
A serious train crash involving a train owned by the Bulgarian company PIMK has occurred near Craiova, Romania. According to initial information, the..
The Ministry of Foreign Affairs recommends that Bulgarian citizens traveling or residing in Canada keep themelselves well-informed about the current..
On Wednesday, the lowest temperatures will range between minus 8°C and minus 3°C, for Sofia around minus 7°C . During the day, snow showers in the..
+359 2 9336 661