The rehabilitated 5th unit of the Belmeken Pumped Storage Hydro Power Plant (Belmeken PSHPP) has officially been opened by Prime Minister Nikolai Denkov and Energy Minister Rumen Radev, public service TV BNT reports.
The project is worth EUR 10 million, 70% of which from the Kozloduy fund, and manager of the programme is the European Bank, Minister Radev said. The first two units were made operational in 2022, another 2 - in 2023, and the last unit is being made operational now. In the past few years the role of these facilities has surpassed the expectations of the people who built them, and pumped storage hydro power plants are now part of the flexibility of our energy system, PM Denkov stated further.
The trial of six Bulgarians accused of spying for Russia continues in the United Kingdom. The head of the "spy cell" Orlin Rusev and Biser Dzhambazov pleaded guilty. Three others - Katrin Ivanova, Vanya Gaberova and Tihomir..
Today's eighth attempt by the Bulgarian MPs to elect a speaker of the National Assembly also proved unsuccessful. At the beginning of the day, there was a ray of hope that this time the people's representatives would reach a..
Public attitudes towards HIV/AIDS in Bulgaria show that a quarter of Bulgarians are ready to keep friendships with HIV-positive people, BTA reported. Men are slightly more tolerant than women (28% versus 23%). The data are from a..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
From March 30, 2025, a new direct flight will connect Sofia and Pisa, Italy. A statement from Sofia Airport states that the flights will be..
+359 2 9336 661