"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
A cold front will pass through the country overnight and tomorrow from the northwest . Rain will fall in many places in the western regions and the Danube Plain, and will quickly turn to snow in the high fields of western Bulgaria and the Balkan Range...
56% of Bulgarians prefer the new 51st National Assembly to form a government, even if this is at the cost of compromises, indicate data of a national representative survey conducted by the polling agency "Gallup International" for the "Referendum"..
A Memorandum of Cooperation between Cluster Trakia Economic Zone and Shenzhen Polytechnic University (SZPU) was signed in Beijing by Katya Staykova, CEO of Cluster Trakia Economic Zone, and Ms. LI Yue, Vice President of the Chinese higher education..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an..
+359 2 9336 661