"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
The damage control and fire-fighting teams in Shumen have responded to 10 reports of damage due to the strong wind, the Regional Directorate of the Interior Ministry has announced. More often than not the reports were of fallen trees and branches in..
More than 35% of people in this country support the idea of a full annulment of the 27 October early election for parliament , indicates a national survey financed and carried out jointly by bTV and Market Links sociological agency. 26% of the..
The youngest grandmother in Bulgaria is just 28, Dr. Antonio Dushepeev, head of the maternity ward at the University General Hospital in Burgas said for the BNR. 149 underage girls gave birth at the hospital last year alone, the youngest of whom was..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an..
+359 2 9336 661