"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
There is no need for a mediator in relations between Bulgaria and North Macedonia, MEP Andrey Kovatchev told BNR on the occasion of Hungarian Prime Minister Viktor Orbán's proposal to mediate between Sofia and Skopje. Regarding the decoupling..
Caretaker Premier Dimitar Glavchev has convened a meeting at the Council of Ministers to discuss measures for the safe evacuation of Bulgarians from Lebanon, the government press service reported. Representatives from the Ministry of Foreign Affairs,..
Nikola Nikolov - Pascal, considered one of the largest smugglers, has been arrested in Serbia during a joint operation by Bulgarian and Serbian special services. The name of the detainee gained notoriety during the arrest of former National..
On Sunday a cold atmospheric front will pass through the country. In the morning, the cloudiness will begin to increase rapidly from..
Travelling to Israel and staying in the country should be avoided, except in case of emergency, the Bulgarian Ministry of Foreign Affairs said...
Nikola Nikolov - Pascal, considered one of the largest smugglers, has been arrested in Serbia during a joint operation by Bulgarian and Serbian..
+359 2 9336 661