Minister of Energy Rosen Hristov has expressed confidence that the gas interconnector Bulgaria-Serbia will be completed on time and within the budget frame. Today, he inspected the construction activities at the facility with an annual capacity of 1.8 billion cubic meters, which should be operational in October this year.
Currently, together with eight European countries, an analysis of the gas market in South-Eastern and Central Europe is being carried out in order for other countries to diversify their gas supplies, the way Bulgaria has done, the minister added. According to him, Bulgaria is ready to build an additional compressor station to increase capacity to 3.2 billion cubic meters.
GERB leader Boyko Borissov told reporters that he supports the position of US President Donald Trump for peace in Ukraine, but that he insists on Bulgaria remaining loyal to its European partners. The policy of the new US administration may pose..
The second medical service helicopter purchased by Bulgaria has undergone flight tests in the presence of a Bulgarian commission visiting the base of the manufacturer Leonardo S.p.A . in Vergiate, Italy. The team is to carry out the so-called..
The MPs from the 51 st National Assembly adopted a declaration on non-participation of Bulgarian troops in military activities on the territory of Ukraine. 166 voted “for”, 27 “against”, 11 abstained. The declaration was supported by all..
In Plovdiv, experts discuss issues of the food industry, in accordance with the most up-to-date requirements of the Bulgarian and European regulatory..
Education must make children not only knowledgeable but also good people, said Minister of Education and Science Krasimir Valchev at a meeting with His..
On February 19th, the day when Bulgarians worldwide commemorate 152 years since the passing of the Apostle of Freedom, Vasil Levski, Bulgaria’s National..
+359 2 9336 661