Minister of Energy Rosen Hristov has expressed confidence that the gas interconnector Bulgaria-Serbia will be completed on time and within the budget frame. Today, he inspected the construction activities at the facility with an annual capacity of 1.8 billion cubic meters, which should be operational in October this year.
Currently, together with eight European countries, an analysis of the gas market in South-Eastern and Central Europe is being carried out in order for other countries to diversify their gas supplies, the way Bulgaria has done, the minister added. According to him, Bulgaria is ready to build an additional compressor station to increase capacity to 3.2 billion cubic meters.
Bulgaria is growing more and more visible for businesses in the US, said Bulgaria’s President Rumen Radev at a briefing in New York after meeting with representatives of American companies. “Interacting with American companies and with..
If the election for parliament were to be held today, 7 political formations are certain to enter the National Assembly, indicates a poll by Trend agency, commissioned by 24 Chasa daily. GERB/SDS comes first with an approval rating of 24.8%...
The foreign ministers of Bulgaria, Romania, Greece and Croatia held a meeting within the framework of the general debate at the UN General Assembly in New York, Bulgaria’s Foreign Ministry has announced. The foreign ministers of the four..
Friday will be sunny and temperatures will rise during the day to reach 28-33°C, 29°C in the capital. Lows will be between 11 and 16°C, 11°C in Sofia...
For the first time in 38 years the population of Bulgaria has practically stopped its downward trend. In 2023 the decline is by a mere 0.3%, or just..
Bulgaria is growing more and more visible for businesses in the US, said Bulgaria’s President Rumen Radev at a briefing in New York after meeting with..
+359 2 9336 661