Minister of Energy Rosen Hristov has expressed confidence that the gas interconnector Bulgaria-Serbia will be completed on time and within the budget frame. Today, he inspected the construction activities at the facility with an annual capacity of 1.8 billion cubic meters, which should be operational in October this year.
Currently, together with eight European countries, an analysis of the gas market in South-Eastern and Central Europe is being carried out in order for other countries to diversify their gas supplies, the way Bulgaria has done, the minister added. According to him, Bulgaria is ready to build an additional compressor station to increase capacity to 3.2 billion cubic meters.
The situation in the country illustrates the urgent need for the state to create conditions for holding more farmers' markets, where farmers can sell their produce directly to consumers. This was stated by the Bulgarian Farmers' Union in connection..
A specialized police operation by the Directorate of the Bulgarian Anti-Drug and Drug Enforcement Administration (GDBOP) uncovered an organized crime group operating in the Blagoevgrad region , related to the distribution of narcotics. 5 kg of..
Over 70% of Bulgarians are categorically against sending a military contingent to Ukraine. This was stated by Dimitar Ganev from the sociological agency “Trend” in an interview for the Bulgarian National Radio. President Radev opposes sending..
In Plovdiv, experts discuss issues of the food industry, in accordance with the most up-to-date requirements of the Bulgarian and European regulatory..
Education must make children not only knowledgeable but also good people, said Minister of Education and Science Krasimir Valchev at a meeting with His..
On February 19th, the day when Bulgarians worldwide commemorate 152 years since the passing of the Apostle of Freedom, Vasil Levski, Bulgaria’s National..
+359 2 9336 661