Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Scheduled repair starts of Unit 5 of Kozloduy NPP

Photo: Radio Vidin

Today, the planned annual repair of one of the two operating units of the only nuclear power plant in Bulgaria, Kozloduy NPP. This is unit number 5. During the repair period, equipment and systems will be subjected to regular maintenance operations, as well as refueling of the reactor with fresh nuclear fuel. The planned modifications related to the long-term operation of the nuclear facility will be implemented. Repairs are expected to be completed by the second half of May.

The sixth unit of Kozloduy NPP is operating at full capacity.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Wednesday and Thursday will be sunny

On Wednesday minimum temperatures will be between 2 and 12°C, 5°C in Sofia. Maximum temperatures will be 19-24°C, 21°C in the capital. In the higher plateaus of western Bulgaria there are conditions for frost. The day will be bright and sunny with light..

published on 10/1/24 7:05 PM

Government airplane evacuates another 80 Bulgarians from Beirut

The second group of 80 Bulgarians who wanted to leave Lebanon has taken off from Beirut to Sofia onboard the governmental Airbus. The plane is expected to land in Sofia after 7 pm.  The second group of Bulgarians is ready for evacuation from..

published on 10/1/24 6:35 PM

The Netherlands remains the most attractive study destination for Bulgarian students

The interest of young Bulgarians in studying abroad has risen sharply , with a 30% increase compared to last year. In addition, the number of students leaving for the academic year 2024-2025 has increased by about 11%. This is what Kristina Bozhilova,..

published on 10/1/24 4:08 PM