Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Scheduled repair starts of Unit 5 of Kozloduy NPP

Photo: Radio Vidin

Today, the planned annual repair of one of the two operating units of the only nuclear power plant in Bulgaria, Kozloduy NPP. This is unit number 5. During the repair period, equipment and systems will be subjected to regular maintenance operations, as well as refueling of the reactor with fresh nuclear fuel. The planned modifications related to the long-term operation of the nuclear facility will be implemented. Repairs are expected to be completed by the second half of May.

The sixth unit of Kozloduy NPP is operating at full capacity.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Ilia Prodanov

Unfair trade practices are the cause of high food prices

A list of over 10 unfair trade practices that must be stopped will be handed over to representatives of all parliamentary groups. Among them are high mark-ups, hidden fees of retail chains, inequality between Bulgarian and imported..

published on 2/21/25 9:49 AM

International Fair Plovdiv hosts EU food safety conference

In Plovdiv, experts discuss issues of the food industry, in accordance with the most up-to-date requirements of the Bulgarian and European regulatory framework.  The Union of Food Industry is the organizer of the 14th National Scientific and Practical..

published on 2/21/25 9:01 AM

Freezing temperatures expected in most regions of Bulgaria on Friday

On Friday, the minimum temperatures in Bulgaria will be between - 20°C and - 5°C. In Sofia, it will be around minus 13°C.  During the day, it will be mostly sunny. There will be a weak, in the eastern regions to moderate wind from the..

published on 2/20/25 7:35 PM