Today, the planned annual repair of one of the two operating units of the only nuclear power plant in Bulgaria, Kozloduy NPP. This is unit number 5. During the repair period, equipment and systems will be subjected to regular maintenance operations, as well as refueling of the reactor with fresh nuclear fuel. The planned modifications related to the long-term operation of the nuclear facility will be implemented. Repairs are expected to be completed by the second half of May.
The question is not whether Ukraine will join NATO, but when. The answer depends on the theatre of war and the ability to achieve a lasting peace, Bulgarian President Rumen Radev said at the opening of The Economist's 28th Governmental Roundtable, held..
The caretaker government has fulfilled its main task successfully – organizing fair and transparent elections for National Assembly and for European Parliament. All activities were transparent and within the deadlines set, the caretaker cabinet with..
“Five people from the parliamentary group are going to be “torn apart” during the voting for a cabinet but will, most probably, not give their support,” Ivelin Mihaylov, one of the founders of Velichie party said for the BNR. GERB-SDS..
The exhibition "The Buckles – a Universe of Signs" by the Ruse Regional Museum of History is visiting Burgas. The exposition, which will be opened today..
An orange code warning for dangerous precipitation has been issued for seven districts in Central Bulgaria. From midnight on Wednesday, precipitation and..
"It is evident that the political crisis continues and its solution requires not only putting aside personal and party interests but also requires..
+359 2 9336 661