Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

"Agra 2025" brings science and practice together at International Fair Plovdiv

The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra 2025" exhibition in the halls of the International Fair in Plovdiv, BTA reports.  This year's..

published on 2/18/25 7:05 AM

Warning for significant precipitation in ten regions of eastern Bulgaria

On Tuesday, the lowest temperatures will be between minus 5 and 0°C; in Sofia - around minus 5°C. It will remain cold and cloudy with snowfalls over most of the country and rainfall in the southeastern regions. The snow cover will..

published on 2/17/25 6:55 PM

President Radev names Sofia Airport after the Apostle of Freedom Vasil Levski

Bulgaria’s President Rumen Radev named Sofia Airport after the Apostle of Freedom Vasil Levski, the press secretariat of the head of state announced.  Thus, its official name becomes Vasil Levski Sofia Airport. According to the Constitution, the Head of..

published on 2/17/25 5:52 PM