Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Less than 1/3 of Bulgarians expect positive changes from the policies of the new US president

According to the regular sociological survey by Gallup International Balkans in January 2025, society has moderate expectations for positive changes in Europe and Bulgaria from the policies of the new US President Donald Trump. 30.4%..

published on 2/18/25 9:49 AM

Festive concert for Bulgaria’s national holiday to take place in London

The Bulgarian Cultural Institute in London is covering all the costs for the festive concert-performance that will mark the national holiday. The concert will be held at the Ondaatje Theatre, Royal Geographical Society on March 1,..

published on 2/18/25 9:24 AM

Bulgaria to request convergence report for the eurozone by the end of the month

Bulgaria has received encouraging signals at the Eurogroup meeting. "The country has made even greater progress in fulfilling the price stability criterion," said European Commissioner for the Economy Valdis Dombrovskis. When..

published on 2/18/25 8:59 AM