Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

The topic of the so-called ''Shopi nation'' was discussed in Bosilegrad

A forum was held at the BTA press club in Bosilegrad, provoked by the attempts to promote the so-called ''Shopi nation'' in the Western Outlands. MPs, diplomats and representatives of the academic community from Bulgaria took part in the discussion...

published on 2/19/25 9:51 AM

Bulgarian-African Chamber of Commerce to develop relations with the Bulgarian Chamber of Commerce and Industry

Representatives of the Bulgarian-African Chamber of Commerce visited the Bulgarian Chamber of Commerce and Industry and met with its President Tsvetan Simeonov. Albena Jones, Dimitar Turlakov, and Anton Samsonov are among the founders of..

published on 2/19/25 9:08 AM
Photo: Jérémie Bergeron/Radio-Canada

Ministry of Foreign Affairs cautions Bulgarians on severe weather in Canada

The Ministry of Foreign Affairs recommends that Bulgarian citizens traveling or residing in Canada keep themelselves well-informed about the current weather conditions, and regularly check the status of their flights. The Canadian Meteorological..

published on 2/19/25 8:55 AM