Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Inflation has led to higher turnover and a demand for new 100 and 50-Leva bills

During the first 9 months of 2024, the Bulgarian National Bank has put an additional 11 million 100-Leva banknotes into circulation in the country. At the beginning of the year, there were more than 131 million 100-Leva bills in circulation..

published on 10/30/24 8:49 AM

History Museum in Razgrad offers free guided tour of the ancient Abrittus

On 30 October, the Regional Museum of History in Razgrad is organizing free guided tours around the Abrittus archaeological reserve to mark the end of the tourist season. Throughout the day the public will be given a guided tour of the ancient..

published on 10/30/24 6:05 AM

Bulgarian and French polar explorers talk about the challenges in Antarctica

The Embassy of France and the French Institute in Bulgaria, in partnership with the French Polar Institute "Paul-Emile Victor", the Bulgarian Antarctic Institute, the Sofia University "St. Kliment Ohridski" and the Bulgarian National..

published on 10/30/24 5:15 AM