Bulgaria’s National Electric Company has paid off all its debts to the US-owned thermal power plants ContourGlobal Maritza East 3 and AES Maritza East 1, it became clear from the written answer of Bulgaria’s Minister of Energy Temenuzhka Petkova to an opposition MP, BGNES agency informs. Between April 26 and May 9 the National Electric Company has paid a total of EUR 582.4 million to the two thermal power plants, Minister Petkova points out. The Bulgarian Energy Holding covered part of that sum with the loan taken from an international banking consortium. The rest of the money is paid from revenues.
The Bulgarian Society for the Protection of Birds announced the first successful hatching of Egyptian vultures in the wild in our country. The bird is considered the most endangered species on the Balkan Peninsula. The female..
From his Facebook profile, the co-chairman of "We Continue the Change" Kiril Petkov announced that the PP-DB coalition will not negotiate with "Vazrazhdane" to form a cabinet. He defined as "media suggestions" the claims that such..
The Ukrainian Embassy in Bulgaria has called on officials and political forces to refrain from using the topic of the war for political purposes. The diplomatic mission emphasizes that Ukrainians pay the most terrible price every day..
Hungary’s Deputy Interior Minister Bence Retvari stated that the abolition of Bulgaria and Romania’s Schengen borders by land is very important to the..
ContourGlobal Maritsa East 3 TPP has announced that another 160 people from the coal-fired power plant will be laid off in the coming months after the..
The position Bulgaria is going to the NATO summit with indicates that Bulgaria could offer Ukraine EUR 80 million , caretaker PM Dimitar Glavchev told..
+359 2 9336 661