Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
The first marble stature discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian August, announced Prof. Lyudmil Vagalinski who is in charge of the excavations...
President Rumen Radev, who is paying an official visit to Vietnam, delivered a lecture on the occasion of the 75 th anniversary since the establishment of diplomatic relations between the two countries at the Diplomatic Academy of the Ministry of..
“We find the proposal of Boyko Borissov as premier of Bulgaria absolutely unacceptable, we are not going to be involved in any trading in positions.” This is the answer We Continue the Change/Democratic Bulgaria (PP/DB) gave to the proposal by GERB..
The Institute for Computer Science, Artificial Intelligence and Technology at Sofia University "St. Kliment Ohridski has made available for free use the..
Rumen Radev's visit to Vietnam began with a meeting with the community of Vietnamese citizens who have studied and worked in Bulgaria - representatives..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
+359 2 9336 661