Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Precipitation will stop by Thursday night and the weather will be clear on Friday morning. There will be light northwesterly winds in the eastern parts of the country. The weather will be calm in the rest of the country. It will be mostly sunny..
Nearly 60% of parents pay for private tutoring for their children. The main reason why students have to take extra lessons is poor-quality preparation at school, which is not sufficient for applying for high school or university. This is shown by a..
The Movement for Rights and Freedoms (DPS) will immediately return the second government- forming mandate , DPS Co-chairman Delyan Peevski told journalists. He added that the country is heading towards new elections. "The second mandate..
The exhibition "The Buckles – a Universe of Signs" by the Ruse Regional Museum of History is visiting Burgas. The exposition, which will be opened today..
An orange code warning for dangerous precipitation has been issued for seven districts in Central Bulgaria. From midnight on Wednesday, precipitation and..
"It is evident that the political crisis continues and its solution requires not only putting aside personal and party interests but also requires..
+359 2 9336 661