Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

2.5 billion euros allocated for construction of second Danube bridge between Ruse and Giurgiu

Photo: BGNES

The construction of a new Danube bridge near Ruse may begin in 2026, as European funding totalling 2.5 billion euros has been provided, the city's regional governor, Dragomir Draganov reported.

The new bridge over the Danube River will connect Ruse and Giurgiu and its construction will take about two and a half years.

The regional governor also commented on the reasons for the delay in launching the ferry line between Ruse and Giurgiu. According to him, the Romanian side has not yet taken actions to repair the road infrastructure to the ferry complex.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Delyan Peevski

DPS "New Beginning" leaves ALDE

In a statement to the media, party leader Delyan Peevski announced that he had sent a letter to the Alliance of Liberals and Democrats for Europe, in which he announced the decision of DPS-New Beginning to terminate its membership in ALDE. It was taken..

published on 12/23/24 1:03 PM

Citizens demand humane conditions in municipal animal shelters

Animal protection organizations protested in front of the Sofia Municipality, demanding humane treatment in municipal shelters. Environmentalists point out that the dogs are suffering in the cold, crammed into shared cages where they end up eating..

published on 12/23/24 11:00 AM

The repair of Chaira Pumped Storage Hydro Power Plant has been completed

The repair of the second hydro  unit at the Chaira Pumped Storage Hydro Power Plant has been completed, reported BNT. Caretaker Minister of Energy Vladimir Malinov is expected to inspect the facility in the presence of caretaker Premier Dimitar..

published on 12/23/24 10:02 AM