The construction of a new Danube bridge near Ruse may begin in 2026, as European funding totalling 2.5 billion euros has been provided, the city's regional governor, Dragomir Draganov reported.
The new bridge over the Danube River will connect Ruse and Giurgiu and its construction will take about two and a half years.
The regional governor also commented on the reasons for the delay in launching the ferry line between Ruse and Giurgiu. According to him, the Romanian side has not yet taken actions to repair the road infrastructure to the ferry complex.
In the presence of diplomats, Bulgarian Foreign Minister Ivan Kondov unveiled in Plovdiv the latest mural from the ministry's competition "Bulgaria - More Beautiful in NATO". The event is dedicated to the 20th anniversary of the country's membership in..
On Saturday, a cold front will sweep across the country. During the night there will be rain in Western and Central Bulgaria, and snow in the mountains and on higher ground. A snow cover will form. Minimum temperatures 1-6° C., for Sofia around 1°..
Traffic on the Danube Bridge near Bulgaria's Ruse on the border with Romania has been temporarily restored in both directions as of today . Due to the expected increased traffic through the border crossing during the upcoming Christmas and New Year..
12 settlements in Smolyan district are without electricity after the heavy snowfall yesterday. Settlements in the municipalities of Smolyan, Devin and..
This year, employers prefer to replace the 13th salary with Christmas events and bonuses. Less than 50% of companies in Bulgaria pay bonuses...
Long lines of trucks and cars have formed at the border with Turkiye, reported Nova TV. The line of trucks on the Maritsa motorway has reached..
+359 2 9336 661