On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
In its session today, the Bulgarian Parliament will discuss the reasons for the second vote of no confidence in the government . It was submitted by "Moral, Unity and Honor" (MECH) party to the National Assembly's registry last week and supported by..
At a general meeting of the Central Operational Bureau and the Parliamentary Group of DPS-DPS party around the honorary chairman Ahmed Dogan, it was decided that the movement would withdraw its support for the ruling majority. As..
On Wednesday, lows will be between 5 and 10°C, with Sofia around 7°C. The sky will be mostly sunny, with some clouds in the eastern areas before midday. Light to moderate winds will blow from the south-east. Maximum temperatures will be between 19 and..
Finance Minister Temenuzhka Petkova has announced that Bulgaria is ready to join the eurozone. She made the statement at a business breakfast hosted by..
The traditional Bulgarian banitsa has ranked third in the Best Cheese Dishes list by Taste Atlas . The Bulgarian Banitsa with Cheese earned 4.5..
The reactors intended for Bulgaria's unrealised second nuclear power plant project - Belene - will not be sold. This was announced to journalists by..
+359 2 9336 661